Other information:
System Operation
System Diagram - Push Button Start
Item
Description
1
HS1-CAN
2
GWM
3
PCM
4
BJB
5
Run/Start Relay
6
Push Button Ignition Switch
7
BCM
8
Run/Start Relay
Network Message Chart - Push Button Start
GWM Module Network Input Messages
Broadcast Message
Originati..
Line Pressure Test
NOTE:
Perform the line pressure test prior to performing the stall
speed test. If the line pressure is low at stall, do not perform the
stall speed test or transmission damage will occur. Do not maintain WOT in any transmission range for more than 5 seconds.
This test verifies the line pressure is within specification.
Remove the 2 bolts and position aside the air..