Other information:
Install the PTU.
Install the new top PTU bolts.
Torque:
59 lb.ft (80 Nm)
Install the new bottom PTU bolts.
Torque:
59 lb.ft (80 Nm)
Install the PTU support bracket and the support bracket bolts.
Torque:
1:
18 lb.ft (25 Nm)
2:
46 lb...
Removal
NOTICE:
Do not remove or install the M8 nut (20 Nm) on the cable
eyelet bolt while the battery monitoring sensor is attached to the
battery post as this causes damage to the sensor, connector, and
possibly the battery post and case.
Disconnect the battery.
Refer to: Battery Disconnect and Connect (414-01 Battery, Mounting and Cables, General Procedures).
..